Checklist · 9 min

Manufacturing transfer readiness review

A cross-functional checklist for moving from a verified design to repeatable production.

Transfer the product and the knowledge

A drawing package alone is not a transfer. Production needs controlled specifications, methods, equipment, supplier decisions, acceptance criteria, training, and the reasoning behind critical controls.

  • Design and bill-of-material baselines are approved
  • Critical characteristics and incoming controls are defined
  • Work instructions, fixtures, and production tests are ready
  • Suppliers and special processes are qualified
  • Nonconformance, change, release, and traceability processes operate
  • Pilot yield and capacity evidence support launch

Use a formal readiness gate

Quality, engineering, regulatory, operations, service, and commercial owners should review the same evidence before authorizing production release.